  • Jilalan Rail Yard Upgrade

    Jilalan Rail Yard is a key link in the Goonyella coal supply chain, delivering export coal to the Hay Point and Dalrymple Bay coal terminals.

  • Rapid Growth Phase 4

    The project forms part of the BHP Billiton Iron Ore's Rapid Growth Project 4 (RGP4) which will expand BHP Billiton's iron ore capacity in the Pilbara from 129 to 155 million tonnes pa.

  • Eyre Peninsula Rail Upgrade (TRAX)

    The Eyre Peninsula rail project is located at Port Lincoln in South Australia. The network consists of approximately 650km of track serving the grain ports.

  • Rawang-Ipoh Track Doubling

    MVM Rail was equity participant of the Emrail/Leighton joint venture. MVM's main role during this project was to provide expertise to manage the construction, planning and supervision of a 12 month recovery programme.

  • North Quay Rail Link

    MVM Rail was responsible for all of the works required to construct a new rail terminal at the Fremantle Port, including a new dedicated spur line from the Fremantle-Perth Passenger Line.

  • Wilpinjong Coal Loop

    Construction of a 4km long new coal loop – including a 1:18.5 turnout
    on the mainline and a 1:10 turnout.

  • Rapid Growth Phase 3

    MVM Rail, in partnership with John Holland, were engaged to deliver the trackworks component of BHPBIO's Rapid Growth Project #3.

  • SCT Parkes Depot

    Construction of railways sidings for a new depot, involving 7km of new track, turnouts and signalling.

  • Boggabri Coal Loop

    Supply and construction of 4.4km coal loading loop including 2 turnouts and a catchpoint, signalling and interface with train loader.

  • New Delhi Metro Upgrade

    The construction of 38km of double track using direct fixation on top down plinth construction on viaducts.

  • LUAS Tram System

    The LUAS contract was the largest engineering project ever undertaken in
    Ireland. This Design and Construct contract was awarded to a consortium
    AMB comprising MVM Rail, Ballast Needam International and Ansaldo.

  • Austrak Dual Gauge Depot

    The construction and maintenance of a Dual Gauge Depot and Stabling Yard, with a link to the Main Line.

  • Lord St Track Lowering

    Project Management for the elimination of four overhead electrical running tracks over a level crossing.

  • Kalgoorlie to Koolyanobbing Upgrade

    Project Description Installation of 146,500 concrete sleepers from stockpile to the worksite, 90,000 ton of ballast. The project included the replacing of 146,500 sleepers, ballast cleaning the existing ballast where necessary, surfacing of the track, weld...

  • SCT Terminal Altona

    The construction and maintenance of a Depot and Stabling Yard, with a link to the Main Line.