Wilpinjong Coal Loop
Project Description
Construction of a 4km long new coal loop – including a 1:18.5 turnout on the mainline and a 1:10 turnout.
Project Outcome
Completed on time.
Notable Features of the Project
- Used 3 cranes to install the 1:18.5 slung nose turnout on the mainline
- Completed on schedule despite late formation handover
- Scope included the signalling